GB 23864-2023
Firestop material (English Version)

Standard No.
GB 23864-2023
Language
Chinese, Available in English version
Release Date
2023
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB 23864-2023
Replace
GB 23864-2009
 

Introduction

Core changes in the standard revision

Technical fields Requirements of the 2009 version New/changed contents of the 2023 version Engineering impact
Classification system 3 basic classifications Newly added classification of places of use (Important public buildings Z/Ordinary P) and Class D for multi-component materials Strengthen fire protection requirements for key places
Fire resistance performance Single fire condition Distinguish between the two heating curves of building fiber (FXH) and power fire (FDL) Accurately match different fire scenarios
Safety indicators Not required Add smoke toxicity (≥ZA2 level) and air tightness (≤3.5m³/m²·h) Improve the safety of personnel evacuation

Detailed explanation of key performance indicators

1. Physical and chemical performance requirements

The apparent density of flexible organic plugging materials is ≤2000kg/m³, and the compressive strength of inorganic plugging materials is 0.8-6.5MPa. The corrosion test adopts 70℃/90%RH environment for 168h, and no rust is required.

2. Combustion performance classification

Non-inorganic materials must meet GB8624 B2 grade, fire retardant fabric requirements: damage length ≤ 150mm, afterburning/smoldering time ≤ 5s.

3. Fire test method

Cable penetration test pieceStandard configuration:

  • 6 KVV (7×1.5mm²) cables
  • 7 YJV (3×50+1×25mm²) cables
  • 1 DN32 steel pipe
  • 500×100mm steel bridge

Thermocouple arrangement: A temperature measurement point must be set 25mm from the plugging material on the surface of the penetration object


Project implementation suggestions

Selection principles

Important public buildings should select Class Z materials and verify the smoke toxicity index. Power facilities should give priority to FDL fire-resistant products.

Installation points

  1. The cable filling rate shall not exceed the test verification value
  2. Non-flame retardant cables need additional fire retardant coating protection (≥315mm)
  3. 100% displacement space should be reserved for deformable gaps

Acceptance inspection

Key points to check:

  • Air tightness test (important places)
  • Water flushing test (EC/EIC grade products)
  • Temperature rise record of the back-fire surface