T/CCCAT 009-2023
Pricing standard for construction of full face rock tunnel boring machine in coal mine tunnel engineering (English Version)

Standard No.
T/CCCAT 009-2023
Language
Chinese, Available in English version
Release Date
2023
Published By
Group Standards of the People's Republic of China
Latest
T/CCCAT 009-2023
 

Scope
Including coal mine tunnel engineering full-section rock boring machine (TBM) excavation support, coal mine tunnel engineering full-section rock boring machine (TBM) construction auxiliary fees, coal mine tunnel engineering full-section rock boring machine (TBM) equipment installation, coal mine tunnel engineering full-section rock boring machine (TBM) equipment installation, coal mine tunnel engineering full-section rock boring machine (TBM) Rock boring machine (TBM) equipment shifts, coal mine tunnel engineering full-section rock boring machine (TBM) construction costs, etc.

T/CCCAT 009-2023 history

  • 2023 T/CCCAT 009-2023 Pricing standard for construction of full face rock tunnel boring machine in coal mine tunnel engineering

Topics on standards and specifications

Standard and Specification




Copyright ©2025 All Rights Reserved