IEEE P1248/D12-2019
Draft Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants

Standard No.
IEEE P1248/D12-2019
Release Date
2019
Published By
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
Scope
This Guide describes tests performed and provides processes to be followed during the commissioning of electrical and control systems in hydroelectric plants. Guidance for methods to be used@ organization and execution of the testing are provided. While the guide does not provide prescriptive procedures which are plant and equipment specific@ tests are described along with reference standards for more information. The commissioning of electrical equipment may be for a new hydroelectric plant installation; rehabilitation of an existing hydroelectric plant; or replacement and upgrade of existing electrical equipment.



Copyright ©2024 All Rights Reserved